Tin Whistle Studio · Your first week

Welcome, Thea.

You start on Monday, December 7, as our new junior designer. We're 14 people and you make 15. This is your whole first week, so nothing on Monday is a surprise.

Monday, December 7

Arrive at 9:30

Not 9:00. We use the half hour to get your desk ready.

Where

The blue door

On the side street, past the bakery. Ring the bell and Bea comes down.

Bring

ID and bank details

For the I-9 form and payroll. Nothing else. Lunch is on us.

Monday, hour by hour

Day one is planned to the half hour so you never have to wonder where to be.

  1. 9:30
    ArriveBea meets you at the blue door and shows you where coats and bikes go.
  2. 9:45
    Your desk and laptopThe laptop is set up and your email already works. A quick tour: kitchen, print room, supply shelves.
  3. 10:30
    Monday meetingEveryone, standing, 30 minutes. You'll be introduced. Nothing to prepare.
  4. 11:00
    Paperwork with BeaThe I-9, payroll, your key fob and the password manager. Half an hour, then it's done.
  5. 12:30
    Lunch, on usThe whole studio walks to the noodle place around the corner.
  6. 2:00
    The work, with IdrisIdris walks you through the three projects you'll touch first.
  7. 3:30
    Your first taskSmall and real: fit the Pinecone Dairy yogurt label to two new jar sizes.
  8. 5:00
    Ten minutes with BeaWhat confused you today? Then home. Nobody stays late on day one.

The rest of the week

From Tuesday you start at 9:00. Anything without a time here is yours for the label task.

Tuesday December 8

9:30
Files walkthrough with Marguerite: where things live and how we name them. 45 minutes.
11:00
Sit in on Kenji's call with Pinecone Dairy. Listen; you don't need to speak.

Wednesday December 9

10:00
Print room induction with Joss. No printer or cutter until you've done it.
3:00
Coffee with Odalys. She does this with every new hire.

Thursday December 10

2:00
Studio crit. Everyone pins up work in progress. Watch this week, bring something next week.
4:00
Time tracking with Bea, 15 minutes, ahead of your first timesheet.

Friday December 11

11:00
Show Idris where the label task has got to.
3:00
Timesheet in, then your first-week check-in with Bea.
4:00
Studio closes. Fridays are short.

Your checklist

0 of 10 done

Before Monday

During the week

The ticks are for you. They stay in this tab only: reload the page and they clear, and nobody at the studio can see them.

Six people to know

You'll meet everyone at Monday's meeting. These are the six you'll deal with most this week.

What you'll get, and when

No passwords are on this page. Bea hands those over in person on Monday.

ToolWhat it's forYours from
LaptopSet up before you arrive, and yours to take home.Mon 9:45
Email and calendarYour week is already in the calendar.Mon 9:45
Team chatEach project has a channel. Lunch gets decided in the main one.Mon 9:45
Design softwareLicensed to you and already installed.Mon 9:45
Password managerEvery other login lives here, so it's the one password to remember.Mon 11:00
Key fobOpens the blue door from 7:30 a.m. to 7:00 p.m.Mon 11:00
File serverAfter the walkthrough, so nothing lands in the wrong folder.Tue 9:30
Project boardIdris adds you to your three projects.Tue morning
Print roomThe large-format printer and the cutter, after Joss's induction.Wed 10:00
Time trackingHours by project. First timesheet is due Friday at 3:00.Thu 4:00

Good to know

Hours
9:00 to 5:30, Monday to Thursday. Fridays end at 4:00.
Clothes
What you wore to the interview was fine. Closed shoes for the print room.
Lunch
There's a fridge and a microwave. Most of us eat at 12:30 at the long table.
Getting here
No parking at the studio. The bike rack is inside the blue door, and the bus stops at the corner.
Late or sick
Text Bea on the number in her welcome email.

See you Monday. Bea